programcode

Price check · Nov 6, 2026

Nutanix Cloud Platform pricing

No free plan and no public standard price: NCP is quoted by physical CPU core, with plan limits that shape cluster costs.

4.0/10Value score

We may earn a commission if you buy through links on this page. It never changes a score or a ranking. How we make money

Short answer

Pricing is quote-based.

Nutanix Cloud Platform has no free tier or listed free trial. Standard NCP pricing is quote-based on one-to-five-year terms, and the vendor does not publish monthly or annual plan prices. Starter, Pro, and Ultimate are licensed per physical CPU core, with a three-node minimum for production. Your quote will depend on licensed capacity and selected plan; optional storage, database, Kubernetes, and AI products can add to the bill.

01Every plan, line by line

PlanBilled annuallyBilled monthlyBuilt for
Nutanix Cloud Platform Starter—QuoteSmaller production clusters
Nutanix Cloud Platform Pro—QuoteLarger production clusters
Nutanix Cloud Platform Ultimate—QuoteMulti-site deployments

Add-ons and overages

  • Starter: Nutanix Unified Storage, Nutanix Database Service, data-at-rest encryption, native key management, and replication; prices not published
  • Pro and Ultimate: Nutanix Unified Storage, Nutanix Database Service, Nutanix Kubernetes Platform, and Nutanix Enterprise AI; prices not published
  • NC2 pay-as-you-go cloud rates, not standard NCP monthly prices: Pro $0.104 per core-hour; Ultimate $0.131 per core-hour
  • Overage costs not published

02What the plan grid doesn't tell you

Three-node production floor

Every listed plan requires at least three nodes for production. Budget for the cluster infrastructure as well as the per-core software license.

Paid add-ons

Storage, database, Kubernetes, and Enterprise AI add-ons are listed, but their prices are not published. Request itemized costs for your plan.

Unpublished overages

Overage costs are not published. Ask how excess licensed capacity is handled and whether charges apply during a contract term.

Contract commitment

Standard NCP pricing is quote-based on one-to-five-year terms. Confirm renewal terms and the cost of changing core counts or plans.

03Which plan should you buy?

If you are…GetWhy
Smaller production clusterNutanix Cloud Platform StarterLicensed per physical CPU core; supports up to 12 nodes per cluster and requires at least three for production.
Larger production clusterNutanix Cloud Platform ProLicensed per physical CPU core with unlimited cluster size; minimum three nodes for production.
Multi-site deploymentNutanix Cloud Platform UltimateAdds multi-site deployment support to unlimited cluster size; licensed per physical CPU core.

04Is Nutanix Cloud Platform worth the money?

Nutanix Cloud Platform may be worth paying for when an organization needs a single operating model across hybrid infrastructure and wants to run VMs, containers, and AI workloads on it. There is no free tier to validate a production use case, and standard NCP pricing requires a quote. Start with a workload and cluster design, then compare the itemized multi-year quote—including add-ons and excess-capacity terms—with your current infrastructure costs. NC2 hourly rates are a separate cloud option, not standard NCP monthly pricing.

Cheaper Nutanix Cloud Platform alternatives →

Nutanix Cloud Platform pricing FAQ

How much does Nutanix Cloud Platform cost?

Standard NCP prices are not published. The plans are quote-based on one-to-five-year terms and licensed per physical CPU core. Ask Nutanix for an itemized quote that states the core count, plan, add-ons, and any excess-capacity charges.

Is there a free Nutanix Cloud Platform plan?

No free plan or free trial is listed. Nutanix advertises a test drive through hybrid cloud environments, but it does not describe that as a free production license. Confirm what the test drive includes before using it to estimate production costs.

What are the Nutanix Cloud Platform NC2 rates?

The listed NC2 pay-as-you-go rates are $0.104 per core-hour for Pro and $0.131 per core-hour for Ultimate. These are NC2 cloud rates, not standard monthly NCP prices. Confirm the applicable configuration and any other cloud charges with Nutanix.

Which Nutanix Cloud Platform plan has a 12-node limit?

Nutanix Cloud Platform Starter is capped at 12 nodes per cluster. Pro and Ultimate list unlimited cluster size. All three plans require a minimum of three nodes for production and are licensed per physical CPU core.